API RP 92C:2024 pdf download - Managed Pressure Drilling Operations – Controlled Mud Level with a Subsea Blowout Preventer

API RP 92C:2024 pdf download – Managed Pressure Drilling Operations – Controlled Mud Level with a Subsea Blowout Preventer

This document API RP 92C:2024 offers guidance on the planning, installation, testing, and operation of wells that have been drilled, cased, cemented, completed, or abandoned using managed pressure drilling (MPD) with controlled mud level (CML).

Scroll to Top